Call Us: +61 466 368 934
The RIC Group WMS
  • Home
  • Our Solutions
    • Warehouse Management Solution (WMS) >
      • WMS for Acumatica
      • WMS for SAP Business One
      • WMS for Business Central
      • WMS for Sage Intacct
      • WMS Sage 300
      • WMS for MYOB Acumatica
      • WMS for MYOB EXO
      • WMS for Odoo
      • WMS for S/4 HANA
      • WMS for Tencia
      • WMS for Oracle Cloud ERP
      • WMS for Netsuite
    • Transport Management System (TMS)
    • Last Mile Delivery
    • Warehouse 3D Digital Twin
    • RFID
    • AUTONOMOUS MOBILE ROBOTS
  • Support
  • Blog
  • Success Stories
  • About
    • Our Values
    • FAQ
    • Consulting Division
    • DevOps
    • Intelligent Cloud Insights
    • Case Studies
    • GS1 Standards
  • Contact Us

Optimizing Warehouse Efficiency: Time and Motion Testing Before and After WMS Implementation

24/2/2025


 
In the fast-paced world of warehouse management, efficiency is the cornerstone of success. Time and motion testing plays a crucial role in measuring and optimizing operational performance, particularly before and after the implementation of a Warehouse Management System (WMS). This structured approach provides valuable insights into productivity gains, process improvements, and cost savings.

Understanding Time and Motion Testing
Time and motion studies involve analyzing warehouse workflows to assess the duration of specific tasks and identify inefficiencies. This methodology helps establish benchmarks and highlights opportunities for automation and process refinement.

Key areas of focus in a warehouse setting include:
  • Picking and Packing – Evaluating the time taken to pick, pack, and prepare orders for shipment.
  • Putaway and Replenishment – Measuring efficiency in storing inbound stock and restocking pick faces.
  • Inventory Counts – Assessing the speed and accuracy of stocktaking.
  • Travel Time – Identifying unnecessary movements within the warehouse.
  • Error Rates – Analyzing incorrect picks, misplacements, and returns.

Time and Motion Testing Before WMS Implementation
Before a WMS is implemented, warehouses often rely on manual processes or outdated systems that create inefficiencies. Time and motion testing at this stage typically reveals:
  • Excessive Travel Time – Operators take indirect routes due to poor layout planning or lack of real-time location tracking.
  • High Error Rates – Manual data entry leads to mispicks, shipping errors, and inventory discrepancies.
  • Low Productivity – Staff spend significant time searching for stock or verifying orders.
  • Bottlenecks in Workflow – Picking and packing operations may suffer from congestion and delays due to paper-based processes.

By capturing these inefficiencies through detailed testing, businesses can quantify their impact and set performance improvement targets for the WMS implementation.

Time and Motion Testing After WMS Implementation
After deploying a WMS, another round of time and motion testing provides measurable evidence of performance improvements. Common expectations include:
  • Reduced Picking Time – Optimized picking routes and real-time stock visibility significantly cut down travel time.
  • Enhanced Accuracy – Barcode scanning, RFID, and automation ensure near-perfect order accuracy.
  • Faster Putaway and Replenishment – System-driven putaway strategies minimize time spent locating storage locations.
  • Better Labor Utilization – Task prioritization and workload distribution improve efficiency and reduce idle time.
  • Decreased Returns and Rework – Improved order accuracy leads to fewer returns and customer complaints.

Setting Expectations for WMS Success
A well-implemented WMS should deliver significant efficiency gains, but the degree of improvement depends on factors like warehouse size, workforce adaptability, and system configuration. Based on time and motion test results, businesses can expect:
  • 20-40% Reduction in Travel Time – System-guided workflows optimize movement.
  • 25-50% Improvement in Order Accuracy – Automated validation reduces human errors.
  • 30-60% Faster Order Processing – Streamlined processes and real-time inventory tracking enhance speed.

Conclusion
Time and motion testing is a powerful tool for assessing warehouse efficiency before and after WMS implementation. By measuring key performance indicators and setting realistic expectations, businesses can fully realize the benefits of a WMS, leading to a smarter, faster, and more cost-effective warehouse operation.

Experience a faster, smarter warehouse with TBO4 — our WMS is designed to guarantee a significant speed increase from order release to ERP update

Contact us as [email protected] for more information.​

Comments are closed.

    Archives

    June 2025
    May 2025
    April 2025
    March 2025
    February 2025
    January 2025
    November 2024
    October 2024
    September 2024
    August 2024
    July 2024
    June 2024
    May 2024
    April 2024
    March 2024
    February 2024
    January 2024
    December 2023
    November 2023
    October 2023
    September 2023
    July 2023
    June 2023
    May 2023
    April 2023
    March 2023
    February 2023
    January 2023
    December 2022
    November 2022
    October 2022
    September 2022
    August 2022
    June 2022
    May 2022
    April 2022
    March 2022
    February 2022
    December 2021
    November 2021
    October 2021
    August 2021
    July 2021
    June 2021
    May 2021
    April 2021
    February 2021
    January 2021
    December 2020
    October 2020
    September 2020
    August 2020
    July 2020
    May 2020
    April 2020
    March 2020
    February 2020
    January 2020
    December 2019
    November 2019
    October 2019
    September 2019
    August 2019
    July 2019
    June 2019
    May 2019
    April 2019
    March 2019
    February 2019
    January 2019
    December 2018
    November 2018
    October 2018
    September 2018
    July 2018
    June 2018
    May 2018
    April 2018
    March 2018
    February 2018
    January 2018
    December 2017
    November 2017
    October 2017
    September 2017
    August 2017
    July 2017
    June 2017
    May 2017
    April 2017
    March 2017
    February 2017
    January 2017
    December 2016
    November 2016
    October 2016
    September 2016
    August 2016
    July 2016
    June 2016
    May 2016
    April 2016
    March 2016
    February 2016
    January 2016
    December 2015
    November 2015
    July 2015
    June 2015
    May 2015
    April 2015
    February 2015
    December 2014

Copyright © 2025 The RIC Group,
All Rights Reserved
Privacy Statement - Website Terms of Use
  • Home
  • Our Solutions
    • Warehouse Management Solution (WMS) >
      • WMS for Acumatica
      • WMS for SAP Business One
      • WMS for Business Central
      • WMS for Sage Intacct
      • WMS Sage 300
      • WMS for MYOB Acumatica
      • WMS for MYOB EXO
      • WMS for Odoo
      • WMS for S/4 HANA
      • WMS for Tencia
      • WMS for Oracle Cloud ERP
      • WMS for Netsuite
    • Transport Management System (TMS)
    • Last Mile Delivery
    • Warehouse 3D Digital Twin
    • RFID
    • AUTONOMOUS MOBILE ROBOTS
  • Support
  • Blog
  • Success Stories
  • About
    • Our Values
    • FAQ
    • Consulting Division
    • DevOps
    • Intelligent Cloud Insights
    • Case Studies
    • GS1 Standards
  • Contact Us